DOSH Hygiene Technician I & II USECHH 2000 Reg. 17 & 26 • Annual Mandate

Local Exhaust Ventilation (LEV) Inspection & CEM Malaysia

Annual Engineering Control Efficiency Testing & Personal Airborne Chemical Exposure Monitoring (CEM) by DOSH Hygiene Technicians

Direct Statutory Summary DOSH USECHH 2000 (Reg. 17 & 26) • 12-Month Cycle

What is an LEV Inspection & Chemical Exposure Monitoring (CEM) in Malaysia?

A Local Exhaust Ventilation (LEV) inspection tests the capture velocity, duct transport airflow, static pressure, and filtration efficiency of industrial fume hoods, scrubbers, and dust collectors. Under DOSH USECHH Regulations 2000 (Regulation 17), Malaysian employers must have a Hygiene Technician II inspect and certify LEV systems every 12 months.

LEV Engineering Testing & CEM Dosimetry Scope

Conducted by DOSH-registered Hygiene Technician II (for LEV testing) and Hygiene Technician I (for CEM personal airborne sampling) following ACGIH and NIOSH methods:

  • Hood Capture Velocity, Face Velocity & Smoke Pattern Visualization Testing.
  • Pitot Tube Duct Traverse for Static Pressure, Velocity Pressure & Duct Transport Airflow.
  • Centrifugal/Axial Fan RPM, Motor Current, Damper Integrity & Filter Pressure Drop Audit.
  • Personal Breathing-Zone Chemical Exposure Monitoring (CEM) Evaluated Against DOSH Schedule I PEL.
  • SAMM Accredited Lab Analysis (NIOSH / OSHA Methods) & Signed HT I / HT II Statutory Reports.

Malaysian Facilities Requiring LEV & CEM

Chemical Fume Cupboards & QC Labs Spray Booths & Powder Coating Lines Electroplating & Acid Pickling Tanks PCB Soldering & Electronics Assembly Welding Bays & Metal Grinding Wood Dust, Flour & Powder Silos

4-Step LEV & CEM Testing Workflow

  1. CHRA & Engineering Drawing Review

    Inspect your CHRA recommendations, LEV as-built drawings, ACGIH hood classifications, and target chemical PEL limits.

  2. On-Site Airflow & Personal Air Sampling

    Execute anemometer/Pitot traverse testing on LEV ducts and mount calibrated personal air pumps on workers for CEM.

  3. SAMM Lab Analysis & ACGIH Benchmarking

    Analyze CEM sorbent tubes/filters in a SAMM ISO/IEC 17025 lab and compare LEV velocities against ACGIH standards.

  4. Certified HT I / HT II Report & Tagging

    Affix statutory inspection tags on LEV hoods and submit the DOSH-compliant report with corrective engineering advice.

Verified Malaysian Field Track Record

LEV Engineering Control & Air Compliance Scenarios

How Enviwise diagnoses insufficient capture velocities, blocked ductwork, and airborne solvent exposure for Malaysian manufacturers.

Electronics & Chemical Processing

Annual LEV Inspection & Personal Solvent CEM

Challenge Following a CHRA, a Selangor electronics plant needed annual Regulation 17 LEV testing on 8 extraction hoods and personal CEM for isopropyl alcohol (IPA) and soldering fumes.
Enviwise Action Our DOSH Hygiene Technician I & II performed Pitot traverse airflow testing, re-balanced damper static pressure, and ran 8-hour breathing-zone sorbent sampling.
Outcome Restored hood capture velocity above 0.5 m/s and verified personal chemical exposure well below DOSH 8-hour TWA PEL limits.
✓ 100% Below DOSH PEL & ACGIH Compliant
Heavy Industry & Manufacturing

Chimney & Dust Collector Air Emission Monitoring

Challenge Community complaints surfaced regarding dust fallout in adjacent neighborhoods; authority required verified chimney isokinetic emission data.
Enviwise Action Qualified technical team climbed industrial stack to execute EPA/DOE-calibrated isokinetic particulate sampling and flue gas flow profiling.
Outcome Verified particulate emission level was 18.6 mg/Nm³, well below the mandatory 50 mg/Nm³ ceiling, successfully dismissing the complaint.
✓ 18.6 mg/Nm³ (Standard: 50 mg/Nm³)
Manufacturing & Surface Coating

5-Year CHRA Re-Assessment & Solvent Vapor Control

Challenge A Selangor manufacturing facility faced an expired CHRA report during an occupational safety audit while introducing 18 new solvent and adhesive formulations.
Enviwise Action Deployed a DOSH-registered CHRA Assessor (OYK) to audit 45 SDS records across 6 work units, evaluate spray booth LEV capture efficiency, and map dermal/inhalation risks.
Outcome Certified CHRA report delivered in 14 days with clear AP-2 control plans, passing the DOSH inspection and ISO 45001 external audit with zero non-conformities.
✓ 100% DOSH USECHH 2000 Compliant
DOSH Regulation 17 & 26 USECHH 2000 FAQ

Frequently Asked Questions on LEV Inspection & CEM

Direct statutory answers on annual Hygiene Technician II LEV inspections, ACGIH capture velocities, and Chemical Exposure Monitoring.

How often must Local Exhaust Ventilation (LEV) systems be inspected in Malaysia?

Under Regulation 17 of the DOSH USECHH Regulations 2000, every Local Exhaust Ventilation (LEV) engineering control system installed to control hazardous airborne chemicals must be inspected by the employer monthly and formally examined and tested by a DOSH-registered Hygiene Technician II (HT II) at least once every 12 months.

What parameters are measured during an annual DOSH LEV inspection?

Our DOSH-registered Hygiene Technician II measures hood face velocity and capture velocity, duct velocity pressure and transport velocity (via Pitot tube traverse), static pressure across air cleaners/scrubbers/baghouses, fan RPM and current draw, and executes smoke visualization tests against ACGIH Industrial Ventilation Manual design benchmarks.

What is Chemical Exposure Monitoring (CEM) and when is it required?

Under Regulation 26 of USECHH 2000, Chemical Exposure Monitoring (CEM) is required when a CHRA Assessor recommends personal or area air sampling to verify employee exposure against DOSH Permissible Exposure Limits (PEL). A DOSH-registered Hygiene Technician I (HT I) deploys calibrated personal air sampling pumps across a work shift, with samples analyzed by an accredited laboratory.

What types of industrial extraction systems require statutory LEV testing?

Any extraction system controlling chemicals hazardous to health requires annual LEV certification, including laboratory and industrial fume cupboards, spray painting booths, electroplating lip-exhaust hoods, soldering extraction arms, wet chemical scrubbers, cyclone separators, and baghouse dust collectors.

How long does an on-site LEV inspection take and will it interrupt production?

An on-site LEV inspection typically takes 1 day for 3 to 6 LEV systems and is performed while the extraction system operates under normal production conditions, causing minimal disruption. The signed statutory HT II report is delivered within 14 to 21 working days.

What details are needed to get an LEV Inspection or CEM quotation?

Share your factory location, the total number of LEV hoods/fans/scrubbers (and previous LEV report or engineering drawings if available), or for CEM, the list of target chemicals and number of workers recommended in your CHRA report via WhatsApp (+6013-405 1429) or our contact form.